[ PROCLAMATION NO. 66, November 12, 2010 ]
CREATING AND DESIGNATING A BUILDING WHICH SHALL STAND ON THREE PARCELS OF LAND LOCATED AT BARANGAY LAPASAN, CAGAYAN DE ORO CITY, ISLAND OF MINDANAO, AS AN INFORMATION TECHNOLOGY CENTER PURSUANT TO REPUBLIC ACT NO. 7916 AS AMENDED BY REPUBLIC ACT NO. 8748
Lot 2
TCT No. T-58257
Pcs-10-0007566
A parcel of land (Lot 2, Pcs-10-000756, being a consolidation of Lot 5, Block 1, Lot 1, Block 2, and Road Lot 1, Psd-10-005433), situated in the Barrio of Lapasan and Poblacion, City of Cagayan de Oro, Island of Mindanao.
Bounded on the SW., NW., & NE., along lines 3-4-5-6 7-1-2 by Lot 4, (Road Lot), of the consolidation subdivision plan Pcs-10-000756; on the SE., along line 2-3 by Lot 2, Block 2, Psd-10-005433.
Beginning at a point marked 1? on plan, being N. 81 deg. 24 E., 341.65 m. from BLLM No. 1, Cad.-237, Cagayan Cadastre.
thence |
S. |
36 |
deg. |
37 |
E., |
45.81 |
m. |
to point 2; |
thence |
S. |
52 |
deg. |
44 |
W., |
43.45 |
m. |
to point 3; |
thence |
N. |
35 |
deg. |
33 |
W., |
20.13 |
m. |
to point 4; |
thence |
N. |
35 |
deg. |
33 |
W., |
64.74 |
m. |
to point 5; |
thence |
N. |
15 |
deg. |
29 |
E., |
4.11 |
m. |
to point 6; |
thence |
N. |
62 |
deg. |
28 |
E., |
3.70 |
m. |
to point 7; |
thence |
S. |
77 |
deg. |
26 |
E., |
53.49 |
m. |
to point of |
beginning; containing an area of One Thousand Two Hundred Eighty One (1,281) square meters, more or less. All points referred to are indicated on the plan and marked on the ground as follows: Points 2-3 by PS cyl. conc. mons. 15 60 cm., and the rest by PS cyl. conc. mons. 15 40 cm., bearings true, date of original survey, November 1926-July 1932 and that of the consolidation-subdivision March 15-16, 1990, executed by Pesto C. Labis, Geodetic Engineer and approved on March 18, 1990.
Lot 2-A
TCT No. T-204064
Psd-10-060860
Lot |
: |
2-A Psd-10-060860 |
Portion of Lot |
: |
2, Block 2, Psd-10-005433 |
Surveyed For |
: |
Limketkai Sons Milling, Inc. |
Land Use |
: |
Commercial |
Location |
: |
Lapasan, Cagayan de Oro, Island of Mindanao |
Boundaries |
: |
|
on the SE., along line 2-3 by Lot 2-B of the subdivision plan Psd-10-060860;
on the SW., along line 3-4 by Road Lot 1;
on the NW., along line 4-1 by Lot 1, Block 2;
on the NE., along line 1-2 by Road Lot 1; all of Psd-10-005433
Beginning at a point marked 1? on the plan being N. 87 deg. 22 W., 310.81 m. from BLLM No. 41, CAD-237, Cagayan Cadastre.
thence |
S. |
36 |
deg. |
37 |
E., |
27.71 |
m. |
to point 2; |
thence |
S. |
53 |
deg. |
22 |
W., |
43.95 |
m. |
to point 3; |
thence |
N. |
35 |
deg. |
33 |
W., |
27.23 |
m. |
to point 4; |
thence |
N. |
52 |
deg. |
44 |
E., |
43.44 |
m. |
to point of |
beginning; containing an area of One Thousand Two Hundred (1,200) square meters, more or less. All points referred to are indicated on the plan and marked on the ground as follows: 4-1 are Old Points & the rest are P.S. cyl. conc. Mons. 15 40 cms., bearings true, date of original survey, November 1926-July 1932 and that of the consolidation-subdivision June 25, 2009, executed by Ramon E. Labis, Geodetic Engineer and approved on December 1, 2009
Lot 2-B
TCT No. T-204065
Psd-10-060860
Lot |
: |
2-B Psd-10-060860 |
Portion of Lot |
: |
2, Block 2, Psd-10-005433 |
Surveyed For |
: |
Limketkai Sons Milling, Inc. |
Land Use |
: |
Commercial |
Location |
: |
Lapasan, Cagayan de Oro, Island of Mindanao |
Boundaries |
: |
|
on the NE., along line 1-2 by Road Lot 1;
on the SE., along line 2-3 by Lot 3, Block 2;
on the SW., along line 3-4 by Road Lot 1; all of Psd-10-005433
on the NW., along line 4-1 by Lot 2-A of the subdivision plan Psd-10-060860
Beginning at a point marked 1 on the plan being N. 88 deg. 27 W., 294.06 m. from BLLM No. 41, CAD-237, Cagayan Cadastre.
thence |
S. |
36 |
deg. |
37 |
E., |
2.29 |
m. |
to point 5; |
thence |
S. |
52 |
deg. |
54 |
W., |
43.99 |
m. |
to point 6; |
thence |
N. |
35 |
deg. |
33 |
W., |
2.77 |
m. |
to point 7; |
thence |
N. |
53 |
deg. |
22 |
E., |
43.95 |
m. |
to point of |
beginning; containing an area of One Hundred Eleven (111) square meters, more or less. All points referred to are indicated on the plan and marked on the ground as follows: 2-3 are Old Points & the rest are P.S. cyl. conc. Mons. 15 40 cms., bearings true, date of original survey, November 1926-July 1932 and that of the consolidation-subdivision June 25, 2009, executed by Ramon E Labis, Geodetic Engineer and approved on December 1, 2009
IN WITNESS THEREOF, I have hereunto set my hand and cause the sea! of the Republic of the Philippines to be affixed hereto.
Done in the City of Manila, this 12th day of November, in the year of our Lord, Two Thousand and Ten.
(Sgd.) BENIGNO S. AQUINO III |
|
By the President: |
|
(Sgd.)PAQUITO N. OCHOA, JR. |
|
Executive Secretary |